DEVELOPMENT OF A MODEL FOR EVALUATING HYDROELECTRIC POWER POTENTIALS OF SOME SELECTED RIVERS IN EDO NORTH
Loading...
Date
Authors
Journal Title
Journal ISSN
Volume Title
Publisher
DOI
Abstract
Nigeria's power generation capacity is now far insufficient to satisfy the needs of the country's
socioeconomic development. 82 % of the country's electricity is produced by thermal power
plants, which have low capacity utilization and high greenhouse gas emissions. This has
projected the necessity for the growth of hydropower. In underdeveloped nations, achieving
this goal still presents some challenges due to inadequate meteorological and hydrological
databases, which are mostly caused by the absence of functional gauging channels. The aim of
the study is to develop a model for evaluating hydroelectric power potentials of River Orle,
Edion and Orbeh in Edo North of Edo State. Measurements were carried out on River Orle,
Edion and Orbeh with the determination of channel geometry, average monthly velocity, flow
rate, hydro power and associated uncertainty. A 60 years data extension was effected from
the observed two years discharged data using the Gauss Newton Regression Algorithm. The
mass curve method was used to determine the storage capacity of the reservoir on the basis of
the cumulative inflow process for a uniform discharge throughout the year. An optimal design
approach was adopted for the penstock with Solid Works 2021 simulation used to determine
penstock flow dynamics and characteristics. The developed, automated and validated flow
model has an accuracy of 99.99%, 99.54% and 99.98% for cross sectional area, velocity and
flow rate measurement respectively compare to the analytical process while being faster and
more user friendly. The study established similar discharge characteristics for the three rivers
with a uniform power output from R. Orle of 10.00 MW, 4.477 MW for Edion and 5.718 MW
for R. Orbe with uncertainty of discharge measurement of ±10 %. The rivers are capable of
yielding power throughout the year. A levelized cost of energy of $0.044/kWh was established
for the hydropower plants. The EIA on the rivers indicated low level risk and impact by the
reservoirs construction and operation to human and assets in the study area. The study
concluded that the developed model is reliable and accurate in the evaluation of the
hydroelectric generation potentials of rivers and recommend its implementation in the
exploration of Nigeria hydropower resources that will provide the required electrical power
generation to sustain the Nigerian economy