<link rel="stylesheet" href="styles.f3b1fba60ec7970c.css">
FUT Minna Institutional RepositoryFederal University of Technology, Minna

Influence of Contractual Risk on Building Project Delivery in Abuja, Nigeria..

dc.contributor.authorHASSAN, KHAIRAT, M.
dc.contributor.authorMOHAMMED, YAKUBU D.
dc.contributor.authorNMADU, HELEN, G.
dc.date.accessioned2021-06-19T00:30:59Z
dc.date.available2021-06-19T00:30:59Z
dc.date.issued2019
dc.description.abstractContractual risks were risks mostly encountered by contractors in Nigeria and identified to have the consequences on claims, risks in construction especially with the increase construction complexity and the clients are getting more sophisticated in disputes, lack of coordination, delays and inflated costs. Those challenges are due to unanticipated their demands. These challenges prompted this study on influence of contractual risks on building contracts in Abuja. The study largely derives qualitative measure in order to understand the influence of contractual risk on building delivery. The study is criteria – based study, in which certain criteria were outline for the selection of the construction companies. The respondent (stakeholders) samples used in the study were drawn from the total population of stakeholders in the 5 construction companies selected for the study. The total numbers of stakeholders are 220 while 140 were selected for the study following the rules of Krejcie and Morgan, (1970). The analysis of the questionnaires survey data was undertaken using (SPSS) version 20. Correlation analysis was conducted in order to determine the relationship between contractual risks factors and project delivery (time and cost) and the result were found to be significant (Pen_US
dc.identifier.urihttp://repository.futminna.edu.ng:8080/jspui/handle/123456789/3759
dc.language.isoenen_US
dc.publisherEnvironmental Design and Management International Conference ( EDMIC, 2019).en_US
dc.relation.ispartofseries;241-247
dc.subjectcontractor, contractual risk, project cost, project timeen_US
dc.titleInfluence of Contractual Risk on Building Project Delivery in Abuja, Nigeria..en_US
dc.typeArticleen_US

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
New Doc 32.pdf
Size:
2.62 MB
Format:
Adobe Portable Document Format
Description:

License bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description: