Impact of the Gurara River (Nigeria) interbasin water transfer scheme on the Kaduna River at the Shiroro Dam
Loading...
Date
Authors
Journal Title
Journal ISSN
Volume Title
Publisher
IAHS
DOI
Abstract
The Kaduna River is impounded at Shiroro for the sole purpose of
generating electricity. There is, however, a persistently low reservoir level
between November and June due to seasonal fluctuations in the river inflows
to the Shiroro Reservoir. A proposed scheme to increase Shiroro Reservoir
storage is to transfer 1500 Mm3 of water (which is about 10% of the mean
annual inflow to Shiroro Reservoir) from the Gurara River to the Shiroro
Reservoir between December and May. The interbasin water transfer is
intended to stabilize the Shiroro Reservoir level. This paper examines the
effect of the water transfer on the storage level of this reservoir. Fourteen
years of daily inflow record were used to study the real-time operation of the
reservoir. The results indicate that with the water transfer, the reservoir attains
its maximum operating level in July and maintains it until September or
October, whereas the maximum operating level would have been attained in
August without the transfer. Although the interbasin water transfer into the
Shiroro Reservoir would enhance power generation, there would be an
increase in the frequency and severity of annual flooding downstream of the
dam. Appropriate flood damage mitigation measures are recommended for the
Kaduna River basin to optimize the benefit of the proposed interbasin water
transfer scheme.