ABSTRACT
The project is aimed at addressing and evolving positive measure of
timely and prompt maintenance programmes for Lokoja roads. Due to
untimely maintenance by the concerned road maintenance authority
these roads have developed into a very bad state hereby posing death
traps to motorists. To address the problem, reconnaissance survey,
condition surveys and site inspections were carried out. The present
maintenance cost for Adankolo Ring Road was calculated as
N2,587,414.08, Ganaja Lokoja Road N2,496,129.00. Present
maintenance cost for Nataco - Kaduna Junction road was calculated as
N8,013,945.60 and the present maintenance cost for Aliyu Obaje Road
was calculated as N529,813.44 and that of Government House Road
was given as N2,272,448.40. The sum total maintenance cost was
calculated as N15,899,750.52. Postponed or delayed maintenance will
result not only in economic loss of hard earned resources expended in
the road infrastructure but would also increase the number of
accidents and to the need for expensive reconstruction to restore the
asset to original standard or shape.