<link rel="stylesheet" href="styles.f3b1fba60ec7970c.css">
FUT Minna Institutional RepositoryFederal University of Technology, Minna

Road pavement collapse from overloaded trucks due to traffic diversion: A case study of Minna-Kateregi-Bida Road, Nigeria

dc.contributor.authorAlhaji, Mustapha Mohammed
dc.contributor.authorAlhassan, Musa
dc.contributor.authorAdejumo, Taiye Adejumo
dc.contributor.authorAbdulkadir, Hamidu
dc.date.accessioned2023-05-03T17:55:03Z
dc.date.available2023-05-03T17:55:03Z
dc.date.issued2021
dc.description.abstractSudden failure of road pavement structure from Minna through Kataeregi to Bida in Niger State, Nigeria, occurred in 2020 due to high traffic volume of overloaded trucks. The high traffic volume was necessitated by the collapse of two alternative routes (Tegina-Makera-Mokwa and Lambata-Bida-Mokwa roads) that were previously being used by these heavy trucks. Methodology used to study the causes of this sudden failure includes interaction with the Niger State Ministry of works, visual route survey of the entire road, conduction of trial pits within the worst sections of the road and collection of soil samples for analysis and finally, generation of soil profile within these sections to show the probable causes of the sudden failure. Result of visual route survey revealed that the entire stretch of the road which geologically cut across basement complex from Minna to Kataeregi and Bida basin from Kataeregi to Bida, has failed with potholes, pavement cracks, ruts, large depressions and embankment failures. However, some sections were observed to have collapsed completely. Trial pits conducted within the collapsed sections also showed defects including thick organic soil layer underlying road embankment, clay of high plasticity underlying organic soil layer and shallow water table within the region of the basement complex. A long and high embankment across a wide river channel was observed to have failed due to the failure of the thin metal sheet tubes employed to move the heavy flood water across the embankment. It was then concluded that these defects resulted from poor geotechnical investigation prior to construction and the poor expertise of the firm involved in the construction of the road.en_US
dc.description.sponsorshipSelfen_US
dc.identifier.citationAlhaji et al., 2021en_US
dc.identifier.urihttp://repository.futminna.edu.ng:8080/jspui/handle/123456789/18600
dc.language.isoenen_US
dc.publisherElsevieren_US
dc.subjectOverloaded Trucks Traffic Volume Pavement Collapse Axle Load Pavement Failure Response Shallow Water Tableen_US
dc.titleRoad pavement collapse from overloaded trucks due to traffic diversion: A case study of Minna-Kateregi-Bida Road, Nigeriaen_US
dc.typeArticleen_US

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
P24 Alhaji et al 2021 Road Pavement Elsevier Published.pdf
Size:
12.39 MB
Format:
Adobe Portable Document Format
Description:

License bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description: