<link rel="stylesheet" href="styles.f3b1fba60ec7970c.css">
FUT Minna Institutional RepositoryFederal University of Technology, Minna

Modelling the Effect of Time Overrun and Inflation Rate on Completion cost of Construction Projects in Nigeria

dc.contributor.authorDiugwu, Ikechukwu
dc.contributor.authorEtte, Erik H
dc.contributor.authorBaba, Dorothy Ladi
dc.contributor.authorMohammed, Musa
dc.contributor.authorYakubu, Henry A
dc.date.accessioned2022-12-24T03:47:33Z
dc.date.available2022-12-24T03:47:33Z
dc.date.issued2017-10-03
dc.description.abstractVariations in the approved cost of projects are common and could be triggered by a fluctuation in interest rates and variation in project duration. The paper aimed to explain the effect of time overrun (TO) and inflation rate on project completion cost (PCO). Variations in costs and durations of projects were calculated for 250 government and private building projects executed between 2005 and 2015, while inflation rates for the last quarter of these years were used. A multiple regression analysis of cost overrun as the endogenous variable, with time overrun and inflation rates as the exogenous variable was conducted for private and government-funded projects. The result revealed that the cost overrun can be predicted by the equations; predicted private cost overrun = 669673.60 + 50182.35 (time overrun) + 106690.20 (inflation rate), and predicted government cost overrun = -9805996 – 148721.90 (time overrun) + 1266038 (inflation rate) respectively for private and government-funded projects. Also, while there is evidence of a significant relationship between the completion cost of projects and variations in time and inflation rate for both private and government-funded projects, the mean variations between time overrun and inflation rate viz a viz completion cost is not equal for private and government-funded projects.en_US
dc.identifier.issn2180- 3242
dc.identifier.urihttp://repository.futminna.edu.ng:8080/jspui/handle/123456789/15967
dc.publisherInternational Journal of Sustainable Construction Engineering & Technologyen_US
dc.relation.ispartofseriesVol.8;No.2
dc.subjectCompletion cost, Inflation rate, Project duration, Project, Constructionen_US
dc.titleModelling the Effect of Time Overrun and Inflation Rate on Completion cost of Construction Projects in Nigeriaen_US

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
modelling journal .pdf
Size:
502.94 KB
Format:
Adobe Portable Document Format
Description:

License bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description: