Investigation of stakeholders' awareness and adoption of Inherently Safer Design (ISD) principles in South African utility industry projects.
Loading...
Date
Journal Title
Journal ISSN
Volume Title
Publisher
Journal of Loss Prevention in the Process Industries
DOI
Abstract
The paper examines the level of awareness of stakeholders in adopting Inherently Safer Design (ISD)
principles in the Project Life Cycle Management (PLCM) of South African Energy utility projects. It seeks
to understand whether stakeholders in the latter stages of the Project Life Cycle are competent to make
design change decisions on these projects. ISD principles are essentially useful for reducing risks and as
such, safety experts have acknowledged it as an excellent approach in the design process. However, there
are no known efforts to date that attempt to integrate ISD concepts into PLCM. This paper seeks to fill this
gap. This study, through the review of extant literature establishes that ISD principles can be used in
project procurement, and adopts a quantitative survey approach in obtaining information from stakeholders
in the South African utility industry. Findings reveal that the principles of inherent safety are
permeating into the management of South African utility projects but the level of awareness and its
adoption are below optimal levels. It also emerged that there is a divergent awareness of ISD strategies
amongst PLCM stakeholders and that the design engineers are better informed about the ISD approach of
eliminating risks and hazards in the industrial systems studied than other stakeholders. The findings also
indicate that the level of awareness of stakeholders of ISD principles is greater within earlier project
phases. Based on these findings, the paper concludes that the hazards witnessed within the project
execution and finalization phases could be as a result of the low levels of awareness, divergent views and
lower use of ISD strategies by PLCM stakeholders. It is suggested that the level of awareness of the
principles, concepts, basics and benefits of integrating ISD into PLCM be raised amongst stakeholders
functioning within utility industry project procurement in South Africa and that design changes be
limited to the earlier phases of utility project procurement
