THE PROJECT MANAGEMENT TASK OF MONITORING LABOUR COST ON SITE: A CASE STUDY OF MINNA IN NIGER STATE OF NORTH-CENTRAL, NIGERIA
Loading...
Date
Authors
Journal Title
Journal ISSN
Volume Title
Publisher
FACULTY OF ENVIRONMENTAL SCIENCES, UNIJOS
DOI
Abstract
ABSTRACT
The frequent issues arising from the management of productivity of labour on site in Nigeria has resulted in the
project delay and cost overruns. While some project stakeholders claimed that the absence of project
supervisors on site to monitor the activities of operatives on site is responsible for the loss of productivity, some
are of the opinion that ineffective trade unions on construction sites should be blamed. This paper aims at
examining the task of monitoring labour cost on site in Minna taking a literature review approach. The
objectives are (i) to determine the various types of labour cost in Nigerian construction sites (ii) to determine
the accurate cost of labour vis a vis the output of workers on site. The research methodology adopted for the
paper is qualitative and exploratory in nature. The workers within the construction sites in minna metropolis
were randomly sampled and interviewed about the daily pay by the site foremen. This was corroborated by the
studies from the literatures. The findings of the study show that project managers on site prefers daily pay to
workers rather than contract payment. It was therefore concluded that trade unions should liaise with
construction stakeholders in determine the appropriate daily wage
