<link rel="stylesheet" href="styles.f3b1fba60ec7970c.css">
FUT Minna Institutional RepositoryFederal University of Technology, Minna

Professionals Perception of the Factors Causing Rework in Building Projects in Abuja.

dc.contributor.authorNASIRU, A. M.
dc.contributor.authorKASIMU, A. M.
dc.contributor.authorMOHAMMED, YAKUBU, D.
dc.date.accessioned2021-06-19T01:23:19Z
dc.date.available2021-06-19T01:23:19Z
dc.date.issued2018
dc.description.abstractNigeria construction industry has been persistently faced with the problems of work in building projects. The aim of this paper is to investigate the cause of rework in building projects with a view to suggest means of reducing rework. A total of 150 numbers of questionnaire were distributed to engineers, quantity surveyors, project managers, construction managers, contractors, consultants and client in construction industry in Abuja. The descriptive method of analysis was used to analyze the data obtained from the survey. The result obtained shows that poor leadership, lack of supervision, poor selection of subcontractors, working overtime, design change, power communication between parties and insufficient skill manpower are the main cause of rework in building projects. Similarly, the following were established as means of reducing reworks, this includes: inadequate information and communication channels, uses of appropriate construction method, effective site management and supervision and quick decision making, systematic control mechanism uses of experienced subcontractors and suppliers, proper project planning and scheduling and delegation of authority. Therefore, the paper recommended that adequate attention should be focused on quality supervision, monitoring and communication between the players during the course of building projects and also develops a systematic control mechanism that would reduce the shoddy work.en_US
dc.identifier.urihttp://repository.futminna.edu.ng:8080/jspui/handle/123456789/3771
dc.language.isoenen_US
dc.publisherEnvironmental Technology and Science Journal,en_US
dc.relation.ispartofseriesVolume 1, Number 2.;94-103
dc.subjectrework, project delivery, project manager, project cost, building projecten_US
dc.titleProfessionals Perception of the Factors Causing Rework in Building Projects in Abuja.en_US
dc.typeArticleen_US

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
New Doc 7.pdf
Size:
2.96 MB
Format:
Adobe Portable Document Format
Description:

License bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description: