<link rel="stylesheet" href="styles.f3b1fba60ec7970c.css">
FUT Minna Institutional RepositoryFederal University of Technology, Minna

Factors Responsible for Slow Adoption of Partnering on Construction Projects in Nigeria

dc.contributor.authorOla-awo, Wasiu Adeniran
dc.contributor.authorRoslan, Bin Amirudin
dc.contributor.authorAlumbugu, Polycarp Olaku
dc.contributor.authorAbdulrahman, Mukaila El-Hussain
dc.date.accessioned2021-07-07T21:02:12Z
dc.date.available2021-07-07T21:02:12Z
dc.date.issued2018
dc.description.abstractPartnering procurement method attracted general acceptance due to potential benefits attached globally. Partnering arrangement was embraced in Nigeria, but the level of implementation is low, the stakeholders hold on to the traditional procurement in spite of its harbored problems. A study that investigated the factors responsible for the slow adoption of partnering in construction in Nigeria is rare. This paper examined factors responsible for the slow adoption of partnering in construction projects execution in Nigeria. This study was conducted using quantitative approach via selfadministered questionnaires on construction practitioners (clients, contractors, and consultants) that have handled partnering projects before. The analysis was conducted using descriptive statistic, Kruskal-Walis, and factor analysis. The analysis reveals that there is an agreement in the ranking of twenty-five out of the twenty-nine factors identified. The study discovered that attitudinal and behaviors factor; lack of technical know-how; external, economic, and institutional related factor, procurement related factor, ineffective communication; unethical related issues, and lack of commitment are responsible for low level of implementation of partnering in Nigeria. The study findings would assist the practitioners and decision-makers on how to achieve best results from their partnering projects. It would also lead to performance improvement which would subsequently lead to the reaping of benefits. The understanding of these factors would assist the decision-maker to plan to tackle it.en_US
dc.identifier.citationOla-Awo et al. (2018). Factors Responsible for Slow Adoption of Partnering on Construction Projects in Nigeria. International Journal of Built Environment and Sustainability, 5(1): 93-105en_US
dc.identifier.issnDOI: 10.11113/ijbes.v5.n1.XXX
dc.identifier.urihttp://repository.futminna.edu.ng:8080/jspui/handle/123456789/7195
dc.language.isoenen_US
dc.publisherFaculty of Built Environment, Universiti Teknologi Malaysiaen_US
dc.relation.ispartofseries5(1);
dc.subjectPartneringen_US
dc.subjectSlow-adoptionen_US
dc.subjectProcurementen_US
dc.subjectConstruction practitionersen_US
dc.titleFactors Responsible for Slow Adoption of Partnering on Construction Projects in Nigeriaen_US
dc.typeArticleen_US

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
5. slow adoption partnering2018.pdf
Size:
867.82 KB
Format:
Adobe Portable Document Format
Description:

License bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description: