<link rel="stylesheet" href="styles.f3b1fba60ec7970c.css">
FUT Minna Institutional RepositoryFederal University of Technology, Minna

DEVELOPMENT AND TESTING OF TRACTOR POWER TAKEOFF (PTO) ELECTRICITY GENERATION SYSTEM

dc.contributor.authorGbabo, Agidi
dc.contributor.authorGana, I. M
dc.contributor.authorMohammed, F. M
dc.contributor.authorIbrahim, M. A
dc.contributor.authorAyoola, R. A
dc.date.accessioned2021-09-26T07:22:17Z
dc.date.available2021-09-26T07:22:17Z
dc.date.issued2018-10
dc.description.abstractThis research work was carried out to design, fabricate and test the performance of tractor power take off (PTO) electricity generation system. This idea was conceived in order to utilize the tractor after pre-planting and planting operations with a view to improving its utilization efficiency and improve farmer’s income. The concept of the design was to convert the mechanical energy of tractor PTO into electrical energy. The implementation consists of gears, belt and pulley, shafts, gear housing, frame, bearings, AC generator. Test results of the system using five different rotor speeds of 900, 1100, 1300, 1500 and 1800 rpm indicated both output voltage and current generated increased with increase in speed of rotation while the resistance decreases with increase in speed. Highest output voltage and current of 220 V and 34 A, respectively were obtained from speed of 1800 rpm whereas low output voltage and current of 120 V and 6.5 (Ω) were obtained from speed of 900 rpm. On the other hand highest resistance of 9.6 (Ω) was obtained from speed of 900 rpm whereas low resistance of 6.5 (Ω) was obtained from speed of 1800 rpm. The equipment is easy to use, demands less effort and easy to dismantle and assemble for transportation and maintenance.en_US
dc.identifier.issn24085162;
dc.identifier.urihttp://repository.futminna.edu.ng:8080/jspui/handle/123456789/13846
dc.language.isoenen_US
dc.publisherFUW Trends in Science & Technology Journal,en_US
dc.subjectGeneratoren_US
dc.subjectTractoren_US
dc.titleDEVELOPMENT AND TESTING OF TRACTOR POWER TAKEOFF (PTO) ELECTRICITY GENERATION SYSTEMen_US
dc.typeArticleen_US

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
32BArticle27.pdf
Size:
993 KB
Format:
Adobe Portable Document Format
Description:

License bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description: