MANAGEMENT OF NEED ASSESSMENT RISKS IN PROCUREMENT OF TERTIARY INSTITUTION CONSTRUCTION PROJECTS IN NIGERIA
Loading...
Date
Authors
Journal Title
Journal ISSN
Volume Title
Publisher
Journal of Biodiversity and Environmental Research
DOI
Abstract
The need assessment stage of project procurement is considered the first step in the public
procurement process in Nigeria which begins with preparation of needs, where all requirements
are clearly defined to determine the best solution between a need and other alternatives.
However, this stage is confronted with risks which affect contract parties and project objectives.
This paper aims to assess needs assessment risks management startegies for construction
procurement of tertiary institution in Nigeria with a view to ensuring effective delivery of
construction projects. The study employed the survey design approach utilising the quantitative
method. A total of 240 structured questionnaires were administered to the respondents
(contractors, procurement officers, and building professionals) of procurement and physical
planning units of tertiary institutions in Nigeria and a total of 175 questionnaires were returned
and found valid for analysis, representing a response rate of 72.91%. The collected data were
analysed using Relative Importance Index (RII) to identify relatively the most important risks
factors in the needs assessment of procurement. Regression analysis was employed to determine
the impact of the identified need assessment risk factors on parties and the impact on project
objectives. The study found that conflict of interest in procurement needs identification; poor
communication between members during procurement need identification; poor project
briefing; and inadequate financial capability of clients as the important need assessment risks
factors. The study also concludes that the needs assessment risks were found to have statistical
significant impact on project objective time, cost, quality, safety and environment; as well as the
parties to the contract. The study concludes that risks reduction, risks avoidance/prevention, and
risk sharing are important risks response strategies in managing needs assessment risks. It is
recommended that procurement process of tertiary institution projects should focused on in depth assessment and management of the risks at the early stage of needs identification/needs
assessment in order to ensure effective delivery of construction projects.
