AN ANALYSIS OF THE EFFECT OF LEAN CONSTRUCTION TECHNIQUES ON CONSTRUCTION PROJECT PERFORMANCE IN NIGERIA
Loading...
Date
Journal Title
Journal ISSN
Volume Title
Publisher
Journal of Biodiversity and Environmental Research
DOI
Abstract
The construction industry has been dotted with reoccurring issues of projects overrunning cost,
and time or both, not meeting quality requirements, reduction in profit margin, fraudulent
practices, and non-compliance to health and safety regulations which have led to the
abandonment of projects. Studies have recommended lean construction as an innovative project
management strategy to cope with these poor performance problems but there is not much
research on lean construction in Nigeria as lean is still a relatively new concept in Nigeria. This
research analysed the effect of lean construction techniques on project performance in Nigeria.
The study adopted a quantitative approach. 350 questionnaires were distributed to professionals
from 71 construction organisations practicing in Nigeria registered with the Federation of
Construction Industry (FOCI), with a response rate of 84%. Data for the research was gathered
using a structured questionnaire through a purposive sampling technique. Data collected was
analysed using Mean Index Score (MIS), and Structural Equation Modelling estimated by Partial
Least Square Method (SEM-PLS). The result revealed that lean techniques have a significant effect
on cost, time, quality, health and safety, and stakeholders’ satisfaction in enhancing the
performance of construction projects in Nigeria. 5S techniques had more effects on the cost
performance of construction projects, TPM had more effects on time, the last planner system had
more effects on quality while root cause analysis had more effects on health and safety and
stakeholders’ satisfaction performance of Nigerian construction projects.
