<link rel="stylesheet" href="styles.f3b1fba60ec7970c.css">
FUT Minna Institutional RepositoryFederal University of Technology, Minna

A MECHANISM FOR WASTE REDUCTION IN STRUCTURAL DESIGN PROCESS IN SOUTH AFRICAN CONSTRUCTION

Loading...
Thumbnail Image

Date

Journal Title

Journal ISSN

Volume Title

Publisher

INTERIM

DOI

Abstract

Structural design process (SDP) consists of three processes of inception; preliminary design and detail design. Each of these processes is laden with waste that adversely affect project performance. Therefore, this study seeks to identify such wastes so as to develop a mechanism for its effective management. To achieve this, action research study was conducted in some consulting engineering firms situated in Bloemfontein, South Africa. The outcomes of the research provides the platform for the development of a suitable mechanism for reduction/elimination of waste in the structural design process in the future study by the researchers. URL: https://journals.co.za/doi/abs/10.10520/EJC188846

Description

School of Built Environment and Engineering, Free State South African Annual Research work

Citation

Aka A., Emuze F. and Das D. (2014): A Mechanism for Waste Reduction in Structural Design Process in South African Construction. INTERIM, 14(1), 2014 pp. 1-10.

Collections

Endorsement

Review

Supplemented By

Referenced By