Contributions of Contracting Parties to Non-Settlement of Final Accounts in Building Projects in Abuja, Nigeria
Loading...
Date
Authors
Journal Title
Journal ISSN
Volume Title
Publisher
Environmental Technology & Science Journal
DOI
Abstract
The defect liability period/final account stage of a project is sometimes rarely settled or even
being delayed by some of the contracting parties, and thereby posing serious challenges on
contractors. The research examined the contributions of contracting parties to non-settlement
of final accounts in building projects in Nigeria. Quantitative technique was adopted in this
study. The targeted population constituted the major construction participants, including
government clients, registered consultants (Architects and Quantity Surveyors, due to their
involvement in valuation and payment certificates) and contractors within Abuja. The
stratified random sampling method was adopted. A total 146 structured questionnaires were
administered to 23 clients, 21 contractors and 102 consultants, from which a total of 119 was
retrieved, representing 86% response rate. The collected data were analysed using the
descriptive statistical and inferential methods. It was found that changes in specifications
during construction, inadequate experience of consultant, and discrepancies in contract
documentation, were the major consultants-related factors that contribute to non-settlement of
final accounts. Also, rework due to errors during construction, unavailability of materials and
equipment, and delay in material delivery, were the major contractors-related factors that
contribute to non-settlement of final accounts in building projects. The results also revealed a
non-significant difference in the views of respondents on these factors by the parties. It can
be concluded that proper management of the identified factors would translate into effective
settlement of final accounts in building projects. The contracting parties could constantly
revise and implement the findings of this research as a reference document, in order to ensure
effective settlement of final accounts in building projects.