Assessment of Cost Management Functions of Quantity Surveyors with Lean Methodology
Loading...
Date
Journal Title
Journal ISSN
Volume Title
Publisher
Universiti Tun Hussein Onn Malaysia (UTHM) and Concrete Society of Malaysia (CSM)
DOI
Abstract
The Construction industry in Nigeria is made up of a wide variety of activities which include the provision
of professional and technical services to clients in the built environment. Despite the provision of these
services to a large number of clients worldwide, the construction industry is still awash by the chronic
problems of low productivity, insufficient quality, time over-runs, and poor safety, which hinder customer
delivered value. The Just-In-Time phenomenon is a characteristic of lean production systems which operate
with very little “fat” (e.g. excess inventory extra workers, wasted space).This study aimed at assessing the
construction management function of the quantity surveyor in line with the principle of lean methodology
(Just-In-Time). This was achieved by exploring the cost management function of the quantity surveyor, to
investigate the current practice of cost management by quantity surveying firms. Data for the study were
sourced primarily with the use of questionnaire and the subsequent data analysis, which employed the use
of descriptive analysis of presenting the data as obtained on tables during the field survey and attempts a
rudimentary establishment of patterns using percentages. The study concluded amongst others, that: all
activities involved in the cost management function of the quantity surveyor are important, and value
adding, corresponding to conversion activities in line with the Just-In-time/lean methodology.
Description
Keywords
Citation
Anifowose, M. O., Ola-awo, W. A. and Mohammed, T.U. (2013). Assessment of Cost management Functions of Quantity Surveyors with Lean Methodology . International Journal of Sustainable Construction Engineering & Technology, 4(2):67-80