ROUTE RE-ALIGNMENT SURVEY FOR COST EFFECTIVE CONSTRUCTION OF A CONNECTING BRIDGE OVER SULEJA-DAM
Loading...
Date
Journal Title
Journal ISSN
Volume Title
Publisher
SETIC, 2016
DOI
Abstract
Before the construction of Suleja dam in 1993, people and goods were conveyed / transported
freely through the old road because the small river separating the adjoining communities (Ija,
sabo bwari, ija kuchiko and ija koro) had a small bridge that accommodated vehicular and
other means of transportation. However, because of the construction of the dam, the
communities once connected are now separated in their economic and social interaction. In
view of this; this research was carried out with the aim of realigning the old road to
accommodate a shorter and cost effective bridge over the dam. Differential Global
Positioning System (DGPS) receivers were used to set-out the new alignment while an
Automatic level was used to transfer height from the Benchmark to the lake. Eco Map 50s
was used to carry out the strip sounding over the proposed bridge route to determine the
water depth. A total length of 2.919km was obtained from the proposed realignment as
against a distance of 3.038km of the old alignment. As a result, a proposed bridge length of
about 514m was achieved as against the 740m of the old alignment. AutoCAD 2010 and
Carlson were used to plot the alignment, as well as the longitudinal profile and length
calculation. In addition Layer stacking of the existing alignment and new alignment of the
area on satellite imagery of the site was also carried-out in order to depict the differences
between the existing road and the proposed realignment.
Description
Keywords
Citation
Ibrahim, O.P., Mark, Z, Isau, A.I., Samaila-ija, H.A. Ajayi, O.G. and Nwadialor, I.J.- Route Re-Alignment Survey For Cost Effective Construction Of A Connecting Bridge Over Suleja Dam. SETIC, 2016.