Stakeholders’ Perceptions of Construction Dispute Resolution Mechanism in Nigerian Construction
Loading...
Date
Authors
Journal Title
Journal ISSN
Volume Title
Publisher
EPPM - Engineering, Project, and Production Management
DOI
Abstract
The nature of construction projects requires the participation of parties with different skills.
Clients, designers, contractors, subcontractors, suppliers and manufacturer are always party
to a project. Diversity in interest and goals means dispute can occur where multiple parties
are involved. For instance, construction projects in Nigeria experience breakdown due to
disputes. This shows justification for this research, which addresses perceptions of
construction stakeholders relative to dispute resolution in Nigeria. The descriptive survey
research design was employed, and a questionnaire was used as the tool for data collection
where eight dispute resolution mechanisms were identified and classified. The results ranked
negotiation and mediation top among the mechanisms. However, negotiation was ranked
high because it is perceived to be time and cost saving, while improving working relations.
The study concluded that negotiation and mediation were effective alternative dispute
resolution mechanism based on the dynamics of project relationships in Nigeria.
Description
Keywords
Citation
Isa, R.B. and Emuze, F.A. (2015). Stakeholders’ Perceptions of Construction Dispute Resolution Mechanism in Nigerian Construction. Proceedings of the 6th International Conference on Engineering, Project, and Production Management (EPPM), Gold Coast, Australia, 12-20. ISBN: 976-1-922216-5624-9.