<link rel="stylesheet" href="styles.f3b1fba60ec7970c.css">
FUT Minna Institutional RepositoryFederal University of Technology, Minna

ASSESSMENT TECHNIQUES FOR SUCCESSIVE DELIVERY OF INTERNAL ELECTRICAL BUILDING SERVICE IN ABUJA, NIGERIA

dc.contributor.authorAdamu, Dantala Idrisu
dc.contributor.authorMakinde, Joseph Kolawole
dc.date.accessioned2023-05-22T02:10:23Z
dc.date.available2023-05-22T02:10:23Z
dc.date.issued2021-05-22
dc.description.abstractArchitectural drawings for residential buildings such as those of bungalows and duplexes are not usually accompanied with its corresponding detailed electrical drawings which have led cost engineers such as quantity surveyors/estimators to find a way of determining the cost of electrical services through the use of provisional sums which is more of a guess work. The study developed a cost model in determining cost impact of electrical services in residential buildings in Abuja. Quantitative research techniques were adopted. The study made use of architectural and electrical drawings which involved the generation of the priced bill of quantities from 33 drawings (architectural and electrical), current market prices and site-observed productivity constants for the development of the cost model for electrical installation cost for residential buildings. The findings show the coefficient of determination R2 is 0.172; this shows that the equation is statistically insignificant and so therefore the gross floor area should not be used to estimate the final sub-circuits cost of residential electrical installations work. The findings recommends that floor area is not a good cost predictor of final sub-circuit cost and should therefore not be used in estimating for residential electrical installation costing.en_US
dc.identifier.urihttp://repository.futminna.edu.ng:8080/jspui/handle/123456789/19054
dc.language.isoenen_US
dc.publisher14th Multi-disciplinary Academic Conference, FUTA, 2021en_US
dc.subjectBuilding Serviceen_US
dc.subjectInternal Electrical anden_US
dc.subjectSuccessive Deliveryen_US
dc.titleASSESSMENT TECHNIQUES FOR SUCCESSIVE DELIVERY OF INTERNAL ELECTRICAL BUILDING SERVICE IN ABUJA, NIGERIAen_US
dc.typeArticleen_US

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
Dantala and Makinde 2021 (1).pdf
Size:
812.42 KB
Format:
Adobe Portable Document Format
Description:

License bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description: