CAPACITY ANALYSIS OF MOBIL, KPAKUNGU AND TUDUN WADA ROUNDABOUTS INMINNA METROPOLIS
Loading...
Date
Authors
Journal Title
Journal ISSN
Volume Title
Publisher
DOI
Abstract
ABSTRACT
This research addresses the most important element of operational performance of Mobil
roundabout, Kpakungu roundabout and Tudun Wada roundabout: capacity analysis. The
relationship between a roundabout performance measure and capacity is often expressed in
terms of degree of saturation (demand volume-capacity ratio). For Kpakungu roundabout
which comprises of Bida road, Dutsenkura road, Barkinsale road and Soje A road. Their
entry volumes (vehlhr) are as follows: 990, 289, 711 and 234 respectively. Their capacities
(vehlhr) are as follows: 779, 546, 764 and 535 respectively. Their control delay (sec/veh) is
as follows: 710,46.0,32.0, and 0.6. Their level of service (LOS) is as follows: E, D, D, and
B. For Mobil roundabout which comprises of Bosso road, Tunga road, Hospital road and
Market road. Their entry vehicles (vehlhr) are as follows: 990, 789, 511 and 234 respectively.
Their capacity (vehlhr): 779, 646, 564 and 335 respectively. Their control delay: 17.0, 56.0,
42.1 and 0.6. Their level of service (LOS): E, D, D and B respectively. For Tudun wada
roundabout, which comprises of Mobil road, Chanchaga road, Radio.Niger and David Mark
road? Their entry vehicles (vehlhr) are as follows: 940,249,621 and 334 respectively. Their
capacities (vehlhr): 722, 446, 564 and 490 respectively. Their control delay: 61.0, 36.0, 22.0
and 13.0 respectively. Their level of service (LOS): E, D, D and C respectively. Based on this
project a lot was achieved from the research, the physical layout of the entry the roundabout
such as the entry width, inscribed diameter appeared to affect its performance and in addition
car parks for commercial vehicles should be created at a far distance from the major road in
order to reduce traffic delays at Mobil, Kpagungu rounabout and also expansion of the road
for pedestrians.
