An Evaluation of Public Projects using Cost – Benefit Analysis (CPA)
Loading...
Date
Authors
Journal Title
Journal ISSN
Volume Title
Publisher
Journal of Environmental Science (JOES),
DOI
Abstract
This study is aimed at carrying out Cost-Benefit Analysis (CBA) of public projects, as a basis of development
programmes in Nigeria. The objectives are to determine the costs and benefits of public projects and
evaluate the benefit/cost ratios, and some social impacts. Two public projects in Jos (Yakubu Gowon Dam,
Shen and Rwang Pam Stadium) were studied. Data were collected from Plateau State Water Board and
Plateau State Sports Council as well as through structured questionnaire and interviews. The period of
study is 1998 to 2027. The analytical tools used included simple percentage (in the case of the social
impacts; including migration, employment generation and standard of living) and Net Present Value (NPV)
and Internal Rate of Return (IRR) in the case of economic costs and benefits of projects. The results
showed the Yakubu Gowon Dam has N1, 880, 162, 000.00, 1. 68 and 8% NPV, Benefits/Costs ratio and IRR
respectively and Rwang Pam Stadium has N86, 539,000.00, 1. 71 and 7% NPV Benefits/Costs ratio and IRR
respectively. Also, the results of the analysis of the questionnaires show that public projects influence
migration, employment and standard of living positively.
Description
Keywords
Citation
Dakas A. I. I. & Isa R. B. (2006). An Evaluation of Public Projects using Cost – Benefit Analysis (CPA). Case Study of Yakubu Gowon Dam and Rwang Pam Stadium in Plateau State, Journal of Environmental Science (JOES), 10(1), 139-145.