Application of Assignment Model in Optimizing Cost of a Building Project
| dc.contributor.author | Nyor, Ngutor | |
| dc.contributor.author | Olaniyan Toyin | |
| dc.contributor.author | Ladi Kevin | |
| dc.date.accessioned | 2021-06-15T16:32:12Z | |
| dc.date.available | 2021-06-15T16:32:12Z | |
| dc.date.issued | 2015-12 | |
| dc.description.abstract | The study sought to minimize the total cost of buildinga three bedroom Detached House in Minna. An Assignment problem was formulated and using Hungarian solution method, a realistic result was obtained. The sighting study with unpopular scenario in building recommended the sum of N3,885,000 which can be used to build a house of the type and specifications as provided in the study. | en_US |
| dc.identifier.uri | http://repository.futminna.edu.ng:8080/jspui/handle/123456789/3290 | |
| dc.language.iso | en | en_US |
| dc.publisher | Nigerian Journal of Mathematics and Applications | en_US |
| dc.title | Application of Assignment Model in Optimizing Cost of a Building Project | en_US |
| dc.type | Article | en_US |
Files
Original bundle
1 - 1 of 1
Loading...
- Name:
- PAPER with Ladi, Assignment Model.pdf
- Size:
- 232.6 KB
- Format:
- Adobe Portable Document Format
- Description:
License bundle
1 - 1 of 1
Loading...
- Name:
- license.txt
- Size:
- 1.71 KB
- Format:
- Item-specific license agreed upon to submission
- Description:
