<link rel="stylesheet" href="styles.f3b1fba60ec7970c.css">
FUT Minna Institutional RepositoryFederal University of Technology, Minna

Modelling of River Flow System: Issues for Water Resources Planning and Management, Nigeria

dc.contributor.authorOtache, Jimoh, Abubakar
dc.contributor.authorAnimashaun, Iyanda Murtala
dc.date.accessioned2021-08-13T14:17:19Z
dc.date.available2021-08-13T14:17:19Z
dc.date.issued2016
dc.description.abstractPlanning and management of water resources system in recent time predictably entail modeling. This has assisted to a great in understanding some hydrological process and river flow dynamics; however, there are still some flaws or bottlenecks arising from model error. Though, inherent limitation of models as representations of any real system is crystal clear, appropriateness of variables and their combination coupled with their mathematical relationships could bring closeness of model closer to real life system. Thus, stochastic approach to river flow system is better incorporated with possibility for nonlinearity and heteroscedasticity of the entire dynamics for determining an appropriate model structure. More importantly, since studies on nonlinear mechanism vis-à-vis conditional heterosdasticity in hydrological process has been very austere modeling data with time varying conditional variance could be attempted in various way using either the nonparametric or parametric approach in the context of integrated modeling and forecasting of hydrological processen_US
dc.identifier.urihttp://repository.futminna.edu.ng:8080/jspui/handle/123456789/13538
dc.language.isoenen_US
dc.titleModelling of River Flow System: Issues for Water Resources Planning and Management, Nigeriaen_US
dc.typeArticleen_US

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
mdeling river flow.pdf
Size:
9.37 MB
Format:
Adobe Portable Document Format
Description:

License bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description: