CONCEPTUAL FRAMEWORK FOR CONSTRUCTION PROCUREMENT RISKS MANAGEMENT IN NIGERIAN TERTIARY INSTITUTIONS
Loading...
Files
Date
Authors
Journal Title
Journal ISSN
Volume Title
Publisher
Proceedings of the 5th Research Conference of the NIQS (RECON 6)
DOI
Abstract
The procurement system practiced by public tertiary institutions in Nigeria is bedevilled with problems of
mismanagement and corruption. These institutions are part of government Ministries, Departments and
Agencies (MDAs) responsible for implementing the Procurement Act under the monitoring and supervision
of the Bureau for Public Procurement (BPP). One of the challenges is the failure to determine the risks limiting
project delivery success. These risk factors can cause a significant increase in the procurement cost leading to
increase in the overall project cost, time and poor quality. The existing procurement risks management
frameworks failed to consider the 9 essential steps highlighted by the BPP and failed to provide linkages
between procurement risk management and procurement process. Equally, some key aspects of the 9 essential
steps used as guidelines by most tertiary institutions, like appropriate market surveys, extensive feasibility
and viability studies, fund sourcing/cash flow analysis, selection of procurement routes/options, and contract
management plans, are most times being compromised by tertiary institutions in Nigeria. These problems
attributed to major risks in procurement management process of these institutions. Thus, this research aimed
to develop a conceptual framework for construction procurement risks management in Nigerian Tertiary
institutions. The research adopted a desktop methodology, by conducting a thorough literature search on the
existing procurement management frameworks, which informed the development of the conceptual
framework for effective procurement risks management in Nigerian tertiary institutions. The conceptual
framework revealed that risks management practices must be effective throughout the procurement process
(the 9 essential steps) for effective procurement risks management, which will affect project objectives of
meeting with time, cost, quality, environment and safety. It is recommended that the conceptual framework
should be adopted for procurement risks management in tertiary institution to improving project delivery.