<link rel="stylesheet" href="styles.f3b1fba60ec7970c.css">
FUT Minna Institutional RepositoryFederal University of Technology, Minna

Modelling the Effect of Time Overrun and Inflation Rate on Completion Cost of Construction Projects in Nigeria

dc.contributor.authorDiugwu, Ikechukwu A.
dc.contributor.authorEtuk, Ette H.
dc.contributor.authorBaba, Dorothy L.
dc.contributor.authorMohammed, Musa
dc.contributor.authorYakubu, Henry A.
dc.date.accessioned2021-07-08T15:01:15Z
dc.date.available2021-07-08T15:01:15Z
dc.date.issued2017-10-02
dc.description.abstractVariations in approved cost of projects are common and could be triggered by a fluctuation in interest rates and variation project duration. The paper aimed to explain the effect of time overrun (TO) and inflation rate on project completion cost (PCO). Variations in costs and durations of projects were calculated for 250 government and private building projects executed between 2005 and 2015, while inflation rates for the last quarter of these years were used. A multiple regression analysis of cost overrun as the endogenous variable, with time overrun and inflation rates as the exogenous variable was conducted for private and government funded projects. The result revealed that the cost overrun can be predicted by the equations; predicted private cost overrun = -669673.60 + 50182.35 (time overrun) + 106690.20 (inflation rate), and predicted government cost overrun = -9805996 – 148721.90 (time overrun) + 1266038 (inflation rate) respectively for private and government funded projects. Also, while there is an evidence of significant relationship between completion cost of projects and variations in time and inflation rate for both private and government funded projects, the mean variations between time overrun and inflation rate viz-a-viz completion cost are not equal for private and governmenten_US
dc.identifier.citationDiugwu, I. A., Etuk, E. H., Baba, D. L., Mohammed, M., & Yakubu, H. A. (2017). Modelling the Effect of Time Overrun and Inflation Rate on Completion Cost of Construction Projects in Nigeria. International Journal of Sustainable Construction Engineering and Technology, 8(2), 18-28. Retrieved from https://publisher.uthm.edu.my/ojs/index.php/IJSCET/article/view/1542en_US
dc.identifier.issn2180-3242
dc.identifier.otherhttps://publisher.uthm.edu.my/ojs/index.php/IJSCET/article/view/1542/1166
dc.identifier.urihttps://publisher.uthm.edu.my/ojs/index.php/IJSCET/article/view/1542
dc.identifier.urihttp://repository.futminna.edu.ng:8080/jspui/handle/123456789/7464
dc.language.isoenen_US
dc.publisherUniversiti Tun Hussein Onn Malaysia (UTHM) and Concrete Society of Malaysia (CSM)en_US
dc.subjectcompletion costen_US
dc.subjectinflation rateen_US
dc.subjectproject durationen_US
dc.subjectprojecten_US
dc.subjectconstructionen_US
dc.titleModelling the Effect of Time Overrun and Inflation Rate on Completion Cost of Construction Projects in Nigeriaen_US
dc.typeArticleen_US

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
1542-Article Text-6417-1-10-20171002 (1).pdf
Size:
502.94 KB
Format:
Adobe Portable Document Format
Description:
Modelling the Effect of Time Overrun and Inflation Rate on Completion Cost of Construction Projects in Nigeria

License bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description: