IMPACT OF PUBLIC PROCUREMENT SYSTEM ON PUBLIC BULIDING PROJECTS IN OSUN STATE
Loading...
Date
Authors
Journal Title
Journal ISSN
Volume Title
Publisher
DOI
Abstract
ABSTRACT
This research was designed to study the impact of Public Procurement System on Public
Building Projects in Osun State. Three research question were answered and two hypothesis
were used to guide the study. A structured questionnaire which was developed by the research
and was used for data collection. The structured questionnaire was validated by three (3)
experts from the department of industrial and technology education. The validated instrument
was prepared for a population of study is sixty (60) which consist of forty-five (45) public
buildings and fifteen (15) procurements in some selected public building projects in Osun
State. The instrument was administered to the respondent with the help of three (3) research
assistant. The research questions answers were analyzed using frequency counts, mean and
standard deviation while the t-test used to analyze the hypothesis at 0.05 level of significance.
Findings revealed that all the public building and procurement in public building projects all
agreed to the public procurement success factors that have significant influence on public
building construction performance in Osun State. Findings of the study also revealed that the
public buildings and procurement all agreed to the extent to which due process is observe
and the impact of public procurement system on public building project in Osun State. The
study recommends that the adopt and implement e-tendering/bidding. This will ensure that
the key public procurement success factors, transparency, cost-effectiveness, competition,
fairness, & equity are adhered to costs benefit analysis on public projects to be undertaken
before construction, with stakeholders/community participation. The study also
recommended that the public procurement should be more transparent with possibility of
meeting minutes being made available to the public as well as video archives, proper
documentation at all stages to enhance monitoring, evaluation and audit. The study also
recommends E-Tendering, contractor selection and rating system to be introduced and
implemented. Improve communication and monitoring by adopting ICT.
