Effect of Cost of Scaffolding on Cost of Preliminaries in Multi-Storey Building Projects in Abuja, Nigeria
Loading...
Date
Journal Title
Journal ISSN
Volume Title
Publisher
World Journal of Innovation and Modern Technology. IIARD - International Institute of Academic Research and Development.
DOI
Abstract
This paper investigated the relationship between cost of scaffolding and total cost of
preliminaries for fifty construction projects in Abuja, Nigeria. Data used for the study were
obtained using pro forma method of data collection for both cost of scaffolding and
preliminaries for all the fifty (50) multi-storey building projects studied. The use of both
descriptive and inferential statistics was adopted to analyze the collected data. Percentage was
used for the descriptive analysis while hierarchical multiple regression analysis was used for the
inferential analysis and development of predictive models. It was discovered from the analysis
that cost of scaffolding carries a significant proportion from total cost of preliminaries and a
positive, strong and significant relationship exists between the cost of scaffolding and the total
cost of preliminaries in multi-storey building projects. The respective strong value of coefficients
of correlation and determination observed ranges from 76% – 80% and 59% – 62%. The degree
of association between the cost of scaffolding and total cost of preliminaries and that between
the cost of scaffolding and total cost of construction were also respectively found to be strong.
The coefficient of correlation ranges from 75% to 80%. All the three predictive regression
models formulated were discovered to be suitable for predicting the cost of scaffolding with the
use of the total cost of preliminaries and total construction cost at 95% confidence limit. It was
suggested that consultants and contractors should ensure that cost of scaffolding is measured in
detail at the pre-contract stage and that larger project samples should be used in further studies
to formulate better predictive models for cost of scaffolding.
Description
International Journal
Citation
Shittu, Abdullateef Adewale, Idiake, John Ebhohimen, Akanmu, William P. and Mac-Barango, Dumo O. (2022). Effect of Cost of Scaffolding on Cost of Preliminaries in Multi-Storey Building Projects in Abuja, Nigeria. World Journal of Innovation and Modern Technology. IIARD - International Institute of Academic Research and Development. 5(1), 50-62. E-ISSN: 2756-5491; P-ISSN: 2682-5910. Available online at: DOI: 10.56201/ wjimt. www.iiardjournals.org
