Measurement and Analysis of Impact of Supervision On Construction Labour Productivity: A Case Study of North- Central Nigeria
Loading...
Date
Authors
Journal Title
Journal ISSN
Volume Title
Publisher
Bima Journal of Science and Technology
DOI
Abstract
Labour productivity is one crucial factor that directly affect profitability of construction
contracting firms. Labour productivity is one of the most important issues being frequently
discuss among construction firms, construction professionals and stake-holders in the
construction industry as it has a significant impact on performance of all construction projects. This study focus on identifying supervision factors affecting labour productivity. The study
analyse and quantify the impact of supervision on labour productivity in block laying and
concrete activities in North-Central Nigeria. Questionnaire and direct site observation using time
study was employed as data collection instrument. The data were analysed using relative
importance index and regression model. The result of the analysis revealed that 7 factors were
identified by Block layers and Concreters as factors under supervision group and significantly
affect their productivity. The regression model result shows that in block laying, alteration of
drawings and specifications during execution; Incompetent supervisors and late/unclear
instructions were the top most factors having high negative impact (loss of productivity) of
0.745whr/m2; 0.637whr/m2 and 0.61whr/m2 respectively on labour productivity. In concreting, Inspection delay, supervision absentieesm, alteration of drawings and specifications during
execution and incompetent supervisors were the 4 top most factors having high negative impact
of 0.653whr/m2; 0.571whr/m2; 0.537whr/m2 and 0.518whr/m2 respectively on labour
productivity. All the factors identified in this study have negative impact on labour productivity
of the masonry trades considered in this study.
Description
Keywords
Citation
Agbo A.E. and Ayegba C., (2023)
