INFLUENCE OF CONTRACTUAL RISKS ON BUILDING PROJECT DELIVERY IN ABUJA, NIGERIA
Loading...
Date
Authors
Journal Title
Journal ISSN
Volume Title
Publisher
EDMIC, Ile-ife
DOI
Abstract
Contractual risks were risks mostly encountered by contractors in Nigeria and identified to have
the consequences on claims, risks in construction especially with the increase construction
complexity and the clients are getting more sophisticated in disputes, lack of coordination, delays
and inflated costs. Those challenges are due to unanticipated their demands. These challenges
prompted this study on influence of contractual risks on building contracts in Abuja. The study
largely derives qualitative measure in order to understand the influence of contractual risk on
building delivery. The study is criteria – based study, in which certain criteria were outline for
the selection of the construction companies. The respondent (stakeholders) samples used in the
study were drawn from the total population of stakeholders in the 5 construction companies
selected for the study. The total numbers of stakeholders are 220 while 140 were selected for the
study following the rules of Krejcie and Morgan, (1970). The analysis of the questionnaires
survey data was undertaken using (SPSS) version 20. Correlation analysis was conducted in
order to determine the relationship between contractual risks factors and project delivery (time
and cost) and the result were found to be significant (P<0.005). This relationship was modeled
using simple linear regression and from the model the result shows that contractual risks factors
have effect on project delivery in term of time and cost. Risk management should be integrated
into project management processes to minimize the effect of contractual risk factors on time and
cost increase of building project.