Impact of Weather on the Output of Masons in the Nigeria Construction Sites ( A Case Study of Abuja, North Central Nigeria)

dc.contributor.authorMakinde, Joseph Kolawole
dc.date.accessioned2021-07-13T15:19:24Z
dc.date.available2021-07-13T15:19:24Z
dc.date.issued2019
dc.description.abstractLabour productivity is not a new concept in the Nigerian building industry. What is new is the non-inclusion of environmental factors that influence the output of labour on construction sites. This has been a major bane to the productivity of artisans on the construction sites. This paper aims to examine the effect of weather (site temperature) on the output of construction operatives. The objective is to determine the mean output per day of a gang of masons working on blockwork operation in the substructure and superstructure. The area of study was Abuja, the Federal Capital of Nigeria. Seventy (70) operatives were purposively sampled in thirty (30) selected construction sites. The masonry works selected were limited to blockwork operations in the locations specified by Building and Engineering standard of Measurement. The operatives were observed on daily basis on site. Stopwatch and thermometer were employed to measure the time taken to execute a given task at a specific site temperature. The paired sampled T-test was employed to evaluate the extent of effect of the site temperature on the outputs of sampled masons. The results of the analysis show a probability value of 0.000 in wall operations to 0.0325 in pit operation which implies that there is a significant relationship between the site temperature and outputs of masons working on wall operation compared to operations in pit. Therefore, it was concluded that as site temperature increases, the output of masons on wall operations reduces. It is recommended that labour outputs recorded for categories of operations should be adopted by building professionals and contractors in the area of study rather than the continuous usage of labour standard inherited from British colonialist. In addition, construction activity should start early enough on daily basis on site in the sampled area before fatigue sets in.en_US
dc.identifier.urihttp://repository.futminna.edu.ng:8080/jspui/handle/123456789/9067
dc.language.isoenen_US
dc.publisherProceedings of the Environmental Design and Management Conference, Faculty of Environmental Design and Management, OAU, Ife and Faculty of Environment and Technology, University of the West of England, Bristol, United Kingdomen_US
dc.subjectConstructionen_US
dc.subjectEnvironmentalen_US
dc.subjectLabouren_US
dc.subjectMeasurementen_US
dc.subjectProductivityen_US
dc.titleImpact of Weather on the Output of Masons in the Nigeria Construction Sites ( A Case Study of Abuja, North Central Nigeria)en_US
dc.typeArticleen_US

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
15.pdf
Size:
273.42 KB
Format:
Adobe Portable Document Format
Description:
Impact of Weather on the Output of Masons in the Nigeria Construction Sites ( A Case Study of Abuja, North Central Nigeria)

License bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description: