<link rel="stylesheet" href="styles.f3b1fba60ec7970c.css">
FUT Minna Institutional RepositoryFederal University of Technology, Minna

Evaluating rework cost- A study of selected building projects in Niger State, Nigeria

dc.contributor.authorOyewobi, Luqman Oyekunle
dc.contributor.authorIbironke, Timothy O.
dc.contributor.authorGaniyu, Bashir Olanrewaju
dc.contributor.authorOla-awo, Wasiu Adeniran
dc.date.accessioned2021-07-11T10:42:08Z
dc.date.available2021-07-11T10:42:08Z
dc.date.issued2011
dc.descriptionJournal paperen_US
dc.description.abstractRework represents a new terminology in construction dictionary and it becomes essential when an element of building works fails to meet customer’s requirement or when the completed work does not conform to the contract documentation. Reworks contribute to time and cost overruns in project. Thus, to enhance efficient project delivery processes the research work evaluated rework cost on elemental basis in some selected building projects in Niger State. Archival cost data were sourced using a structure research schedule which was self administered on projects identified to have experienced rework amongst the selected projects and these were analysed using simple percentile to show at a glance contribution of each of the building elements to rework. The study revealed Finishes (19.09%) have higher contribution to rework costs than any other elements of building for the projects considered and rework costs on average for the elements 4.49%. Hence, there is need for consensus on a workable mechanism to bring together the client and the contractor to minimize change orders and introduction of additional works during construction phase as this would lead to a reduction in the occurrence of reworks as revealed by the research.en_US
dc.identifier.issn2070-1845
dc.identifier.urihttp://repository.futminna.edu.ng:8080/jspui/handle/123456789/8393
dc.language.isoenen_US
dc.publisherJ0urnal of Geography and Regional Planningen_US
dc.relation.ispartofseriesVolume 4 issue 3;
dc.subjectReworken_US
dc.subjectCost overrunsen_US
dc.subjectTime overrunsen_US
dc.subjectBuilding projects.en_US
dc.titleEvaluating rework cost- A study of selected building projects in Niger State, Nigeriaen_US
dc.typeArticleen_US

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
Oyewobi%20%20et%20al.pdf
Size:
71.03 KB
Format:
Adobe Portable Document Format
Description:
Evaluating Rework Cost

License bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description: