Assessment of Factors Affecting Stakeholder Management in Nigeria Construction Projects
Loading...
Date
Journal Title
Journal ISSN
Volume Title
Publisher
3rd International Engineering Conference (IEC 2019) Federal University of Technology, Minna, Nigeria
DOI
Abstract
Managing multiple stakeholders and maintaining an acceptable balance between their interests are crucial to
successful project delivery. Several factors impede the management of stakeholders for sustainable construction
projects. This study assessed 86 factors affecting stakeholder management which was sub grouped into 12 main
factors. The study employed the use of questionnaires. Data gotten was analysed using reliability analysis, Mean
Item Score and correlation matrix. The study found out that management, conflict and marginalization factors are
significant factors to be considered and improved upon in future construction projects
Description
Citation
Okosun, B. O., Idiake, J.E., Oyewobi, L.O., & Shittu, A. A. (2019). Assessment of Factors Affecting Stakeholder Management in Nigeria Construction Projects. Proceedings: 3rd International Engineering Conference (IEC 2019). School of Electrical Engineering and Technology School of Infrastructure, Process Engineering and Technology, Federal University of Technology, Minna, Nigeria. 24th – 26th September. 61 – 64. ISBN: 978 - 978 - 52341 - 6 – 9.
