<link rel="stylesheet" href="styles.f3b1fba60ec7970c.css">
FUT Minna Institutional RepositoryFederal University of Technology, Minna

Contractors' Tender-Risks Influence on Cost and Time Delivery of Construction Projects in Abuja, Nigeria

dc.contributor.authorGaniyu, Bashir O.
dc.contributor.authorEyong, Obenke P.
dc.contributor.authorOla-awo, Wasiu A.
dc.contributor.authorOyewobi, Luqman O.
dc.contributor.authorJimoh, Richard A.
dc.date.accessioned2024-04-21T12:56:10Z
dc.date.available2024-04-21T12:56:10Z
dc.date.issued2023-11
dc.description.abstractThe construction industry is considered a high-risk sector owing to different factors such as the uniqueness and complexity of projects, diverse stakeholders’, and procurement systems. The study aimed to assess the influence of pre-contract tender-related risks on the post-contract performance of construction projects. A survey-based research design was adopted for data collection using a well-structured questionnaire administered to construction professionals in Abuja that were purposively selected. The data gathered from 102 respondents were analysed using descriptive statistics and paired sample T-test. The study found that two risk factors; ‘low contractor competence’ and ‘unforeseen site condition’ ranked among the top three important risks throughout both pre-contract post-contract stages. It was also discovered that although both pre- and post-contract risks have large effects on the cost and time performance of construction projects, contractors worry more about the cost of work at tendering stage. The three top-ranked strategies for minimising the effects of tender-related risks on construction projects' performance identified are: top management understanding of modern techniques and principles needed for efficient and effective tendering; effective and efficient documentation preparations; and studying project drawings by comparing specifications with actual conditions on site. Contractors’ most significant risks arise from the buildability of designs, level of quality (both at pre-contract stage) and effects of the deficiencies in the contractor’s own competence (at post-contract stage). Therefore, periodic training workshops on tendering risks management will help ensure that adverse effects of tender-related risks are minimized.en_US
dc.identifier.citationGaniyu, B.O., Eyong, O.P., Ola-awo, A.W. Oyewobi, L.O. and Jimoh, R.A. (2023), Contractors’ Tender-Risks Influence on Cost and Time Delivery of Construction Projects in Abuja, Nigeria, ENVIRON Journal of Environmental Studies, 5(1), 82 – 103.en_US
dc.identifier.issn1110 - 457X
dc.identifier.urihttp://repository.futminna.edu.ng:8080/jspui/handle/123456789/27255
dc.language.isoenen_US
dc.publisherENVIRON Journal of Environmental Studiesen_US
dc.subjectContractorsen_US
dc.subjectCosten_US
dc.subjectPerformance Risksen_US
dc.subjectPre-contracten_US
dc.subjectTender Relateden_US
dc.subjectTimeen_US
dc.titleContractors' Tender-Risks Influence on Cost and Time Delivery of Construction Projects in Abuja, Nigeriaen_US
dc.typeArticleen_US

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
Ganiyu et al_2023.pdf
Size:
2.31 MB
Format:
Adobe Portable Document Format
Description:
Contractors’ Tender-Risks Influence on Cost and Time Delivery of Construction Projects in Abuja, Nigeria.

License bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description: