INFLUENCE OF COST CONTROL PRACTICES ON THE COST PERFORMANCE OF CONSTRUCTION PROJECTS IN ABUJA-FCT, NIGERIA

dc.contributor.authorOGUNGBE, Olusogo Bamidele
dc.date.accessioned2022-03-04T10:02:12Z
dc.date.available2022-03-04T10:02:12Z
dc.date.issued2021-09-18
dc.description.abstractThe Nigerian Construction Industry (NCI) faces numerous cost-related challenges that have in some cases increased costs of construction projects by up to 61.84%. Such challenges include the increasing complexity of construction projects which necessitate specialist skills required for their design, construction, operation and maintenance. The control of the cost of construction projects, Project Cost Control (PCC), is thus confronted by new problems, as well as the use of old tools. There is need for cost control methods that will assist project team members in identifying objectives, choosing cost control priorities and setting up a feedback system. The aim of this study was to assess the influence of cost control practices on the cost performance of construction projects as a means of recommending improvements in the cost control process on construction sites. This research was carried out in the Federal Capital Territory Abuja, which as the capital city of Nigeria, has numerous on-going construction activities. A random survey of 65 selected construction practitioners was undertaken with the use of structured, close-ended questionnaires. This research has found that ‘Controlling of sub contract cost’ (Mean Score = 4.49 on a 5.0 scale), ‘Cost variance (Mean Score = 4.48) and ‘Cost reports (Mean Score = 4.43) are the most frequently applied PCC practices. Conversely, construction professionals shied away from the use of S-curve for cost/time monitoring. The study also discovered that 80% of the sample always conducted variance analysis, while only 1% admitted to never checking deviations from budget through variance analysis. It was concluded that ‘Delayed/No payments for works done’ and ‘late/non-involvement of QS in project’ as well as ‘use of outdated cost control techniques’ were the major barriers to realization of the ideal benefits of PCC. These results reveal that more work still needs to be done in the area of use of tools for PCC; the study thus recommended that Quantity Surveyors be introduced to the project as early as possible to help address cost challenges right from the design stages through to the post construction.en_US
dc.identifier.urihttp://repository.futminna.edu.ng:8080/jspui/handle/123456789/14449
dc.language.isoenen_US
dc.titleINFLUENCE OF COST CONTROL PRACTICES ON THE COST PERFORMANCE OF CONSTRUCTION PROJECTS IN ABUJA-FCT, NIGERIAen_US
dc.typeThesisen_US

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
OGUNGBE Olusogo Bamidele.pdf
Size:
2.14 MB
Format:
Adobe Portable Document Format
Description:

License bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description: