Please use this identifier to cite or link to this item: http://repository.futminna.edu.ng:8080/jspui/handle/123456789/9765
Full metadata record
DC FieldValueLanguage
dc.contributor.authorGARBA, Y. Y-
dc.contributor.authorYISA, S. N-
dc.contributor.authorMohoro, I. S-
dc.contributor.authorOgunbode, E. B-
dc.contributor.authorNwoye, U. C-
dc.date.accessioned2021-07-15T23:02:46Z-
dc.date.available2021-07-15T23:02:46Z-
dc.date.issued2021-06-15-
dc.identifier.issn2795 - 3939-
dc.identifier.urihttp://repository.futminna.edu.ng:8080/jspui/handle/123456789/9765-
dc.description.abstractThe purpose of this study is to evaluate the effective time utilization by craftsmen in bricklaying activity on construction projects in Abuja Nigeria. This research is designed to investigate the relationship between effective time utilization and productivity in block laying activity in Abuja. A mixed research methodology was adopted using a questionnaire and direct observation on site. It was observed that there is a significant relationship between effective time utilization and productivity. There are factors affecting effective use of time resulting in loss of productivity. Hence, there should be more effective plan in work activity. The use of baseline productivity benchmark index is highly recommended.en_US
dc.description.sponsorshipSelf sponsoreden_US
dc.language.isoenen_US
dc.publisherJournal of Engineering Computational & Applied Sciencesen_US
dc.subjectTime utilization, productivity, block Laying activity, construction projectsen_US
dc.titleTime Utilization in Block Laying Activity on Construction Projects in Nigeriaen_US
Appears in Collections:Building

Files in This Item:
File Description SizeFormat 
12-Article Text-52-1-10-20210714.pdf309.39 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.