Please use this identifier to cite or link to this item: http://repository.futminna.edu.ng:8080/jspui/handle/123456789/9490
Title: Identifying Critical Success Factors for Achieving Scheduling Performance in Partnering Projects
Authors: Ola-awo, Wasiu Adeniran
Roslan, Bin Amirudin
Alumbugu, Polycarp Olaku
Saidu, Ibrahim
Keywords: Partnering
Scheduling
Project
Success
Performance
Issue Date: 2017
Publisher: International Students Society, Universiti Teknologi Malaysia 2017
Citation: Ola-Awo, A.W., Roslan, B.A., Alumbugu, P.O., and Saidu, I. (2017). Identifying Critical Success Factors for Achieving Scheduling Performance in Partnering Projects. Promoting Innovative Multidisciplinary Research for Sustainable Development” Proceeding of the 3rd International Conference of Science, Engineering and Social Sciences (ICSESS’ 17), UTM, Malaysia. Held 17-18th, 2017, 49-51
Abstract: Underperformance in term of schedule of partnering projects called for this study to proffers for improvement. 32 factors responsible for the success of partnering projects were identified through literature review and pilot interview. This paper aims at investigating which of these factors is responsible for the scheduling performance. The study was conducted through self-administered questionnaire survey and analysis of the obtained data was through multiples statistical tools such as descriptive, Kruskal-Wallis, and ordinal regression. The study discovered that acting inconsistent with the objectives, effective coordination, commitment and support of management and involvement of all the stakeholders are the CSFs of ensuring scheduling performance. The paper, therefore, recommends that all the key players should be engaged from the commencement of the project. The stakeholders should ensure adequate staff, attention, and material before embarking on the project. It was concluded that top management support contributed significantly in ensuring schedule performance of a partnering project. The results of this study would improve the delivery of partnering performance and assist policies makers in decision making.
URI: http://repository.futminna.edu.ng:8080/jspui/handle/123456789/9490
ISBN: 998-978-58482-3-5
Appears in Collections:Quantity Surveying

Files in This Item:
File Description SizeFormat 
identifying CSFs for achieving scheduling performance.pdf1.57 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.