Please use this identifier to cite or link to this item: http://repository.futminna.edu.ng:8080/jspui/handle/123456789/9012
Full metadata record
DC FieldValueLanguage
dc.contributor.authorEze, Emmanuel Chidiebere-
dc.contributor.authorIdiake, John Ebhohimen-
dc.contributor.authorGaniyu, Bashir Olanrewaju-
dc.date.accessioned2021-07-13T12:42:32Z-
dc.date.available2021-07-13T12:42:32Z-
dc.date.issued2018-04-
dc.identifier.citationEze, E.C., Idiake, J.E. & Ganiyu, B.O. (2018). Rework Risks Triggers in Nigerian Construction Industry: A view of Built Environment Professionals. Independent Journal of Management & Production (IJM&P), 9(2), 448 - 472.en_US
dc.identifier.issn2236-269X-
dc.identifier.urihttp://repository.futminna.edu.ng:8080/jspui/handle/123456789/9012-
dc.descriptionResearch paperen_US
dc.description.abstractRework is systemic and a recurring decimal, and it is triggered by several factors whose emergence create scenarios that degrades project cost, quality and schedule performance, and overall project performance. This study therefore examined the perception of construction professionals on the factors that triggers the emergence of rework in the Nigerian construction industry. This was achieved by determining the predominant rework triggers that affect project performance, identifying rework triggers in which the professionals view varies significantly, and examining the category of rework risks triggers that contribute more to rework incidences. The study adopted a quantitative survey approach in which structured questionnaire was adopted as the research instrument. Mean item score was used in ranking the professionals perception on rework triggers, and Kruskal-Wallis H test was used to identify the variables in which the professionals view varies. The study concluded that: contractor-related and design-related causes are the major categories of rework risks triggers. Unclear instruction to workers, Shortage of skilled supervisors, incomplete and inaccurate information are the predominant triggers of rework. The professionals view varies significantly on nine factors which cut across the four categories of rework triggers. It was recommended that there is need for clarity, effectiveness and timeliness of instruction and information dissemination among project participants, and the use of skilled and experienced professionals, skilled supervisors and proper implementation of quality management practices by both the design consultant and contractor throughout the project’s phases.en_US
dc.language.isoenen_US
dc.publisherIndependent Journal of Management & Production (IJM&P)en_US
dc.relation.ispartofseriesVolume 9 No. 2;-
dc.subjectBuilt environment professionalsen_US
dc.subjectConstruction Industryen_US
dc.subjectNigeriaen_US
dc.subjectReworken_US
dc.subjectRisks triggersen_US
dc.titleREWORK RISKS TRIGGERS IN THE NIGERIAN CONSTRUCTION INDUSTRY: A VIEW OF BUILT ENVIRONMENT PROFESSIONALSen_US
dc.typeArticleen_US
Appears in Collections:Quantity Surveying

Files in This Item:
File Description SizeFormat 
Eze et al_Rework Risks Triggers.pdfJournal article288.01 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.