Please use this identifier to cite or link to this item: http://repository.futminna.edu.ng:8080/jspui/handle/123456789/8547
Full metadata record
DC FieldValueLanguage
dc.contributor.authorJimoh, R. A.-
dc.contributor.authorSani, M. A.-
dc.contributor.authorAdoza, A. I.-
dc.contributor.authorYahaya, I.-
dc.date.accessioned2021-07-11T17:11:49Z-
dc.date.available2021-07-11T17:11:49Z-
dc.date.issued2016-03-
dc.identifier.issnISSN 1410-9530 print / ISSN 1979-570X online-
dc.identifier.urihttp://repository.futminna.edu.ng:8080/jspui/handle/123456789/8547-
dc.description.abstractAbstract: Managing risks in construction projects has been acknowledged as a key direction process for the purposes of attaining the project goal in terms of time, cost, quality, safety, and environmental sustainability. Hence, the paper evaluated pre-construction and construction risks on active project sites in Abuja-Nigeria. This was achieved using survey method through the self-administration of 35 questionnaires to the professionals handling the 35 identified projects being undertaking at that time. Results showed that errors and omissions in design and improperly defined project scope had mean score values of 3.03 and 2.54, respectively, were the construction risks most experienced by the professionals during pre-construction. On the other hand, fluctuation in market prices and delays with mean score values of 3.14 and 2.74, respectively, were the construction risks experienced by the professionals during the construction phase of the projects. It is recommended that procurement methods such as construction management should be adopted and stakeholders should keep to their own side of the bargain to avoid unnecessary delays.en_US
dc.language.isoenen_US
dc.publisherCivil Engineering Dimension, Vol. 18, No. 1en_US
dc.relation.ispartofseries;DOI: 10.9744/CED.18.1.1-7-
dc.subjectConstruction; process;en_US
dc.subjectpre-construction; risk;en_US
dc.subjectrisk managementen_US
dc.subjectrisk response.en_US
dc.titleManaging Pre-Construction and Construction Risks on Project Sites in Abuja-Nigeriaen_US
dc.typeArticleen_US
Appears in Collections:Architecture

Files in This Item:
File Description SizeFormat 
Managing Pre-Construction and Construction Risks on Project with cover.pdf451.31 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.