Please use this identifier to cite or link to this item: http://repository.futminna.edu.ng:8080/jspui/handle/123456789/8404
Full metadata record
DC FieldValueLanguage
dc.contributor.authorDiugwu, Ikechukwu A.-
dc.contributor.authorEtuk uthor, E. H.-
dc.contributor.authorMohammed, Musa-
dc.contributor.authorYakubu, H. A.-
dc.date.accessioned2021-07-11T11:14:31Z-
dc.date.available2021-07-11T11:14:31Z-
dc.date.issued2017-10-
dc.identifier.citationDiugwu, I. A., Etuk uthor, E. T., Baba, D. L., Mohammed, M., & Yakubu, H. A. (2017)en_US
dc.identifier.issn2180-3242-
dc.identifier.urihttp://penerbit.uthm.edu.my/ojs/index.php/IJSCET-
dc.identifier.urihttp://repository.futminna.edu.ng:8080/jspui/handle/123456789/8404-
dc.descriptionInternational Journal of Sustainable Construction Engineering & Technologyen_US
dc.description.abstractVariations in approved cost of projects are common and could be triggered by a fluctuation in interest rates and variation project duration. The paper aimed to explain the effect of time overrun (TO) and inflation rate on project completion cost (PCO). Variations in costs and durations of projects were calculated for 250 government and private building projects executed between 2005 and 2015, while inflation rates for the last quarter of these years were used. A multiple regression analysis of cost overrun as the endogenous variable, with time overrun and inflation rates as the exogenous variable was conducted for private and government funded projects. The result revealed that the cost overrun can be predicted by the equations; predicted private cost overrun = -669673.60 + 50182.35 (time overrun) + 106690.20 (inflation rate), and predicted government cost overrun = -9805996 – 148721.90 (time overrun) + 1266038 (inflation rate) respectively for private and government funded projects. Also, while there is an evidence of significant relationship between completion cost of projects and variations in time and inflation rate for both private and government-funded projects, the mean variations between time overrun and inflation rate viz-a-viz completion cost are not equal for private and government funded projects.en_US
dc.language.isoenen_US
dc.publisherUniversiti Tun Hussein Onn Malaysia (UTHM) and Concrete Society of Malaysia (CSM)en_US
dc.relation.ispartofseriesVolume 8;Issue 2-
dc.subjectCompletion cost, Inflation rateen_US
dc.subjectProject durationen_US
dc.subjectProjecten_US
dc.subjectConstructionen_US
dc.titleModelling the Effect of Time Overrun and Inflation Rate on Completion Cost of Construction Projects in Nigeriaen_US
dc.typeArticleen_US
Appears in Collections:Project management Technology

Files in This Item:
File Description SizeFormat 
Journal 7.pdf495.42 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.