Please use this identifier to cite or link to this item: http://repository.futminna.edu.ng:8080/jspui/handle/123456789/8404
Title: Modelling the Effect of Time Overrun and Inflation Rate on Completion Cost of Construction Projects in Nigeria
Authors: Diugwu, Ikechukwu A.
Etuk uthor, E. H.
Mohammed, Musa
Yakubu, H. A.
Keywords: Completion cost, Inflation rate
Project duration
Project
Construction
Issue Date: Oct-2017
Publisher: Universiti Tun Hussein Onn Malaysia (UTHM) and Concrete Society of Malaysia (CSM)
Citation: Diugwu, I. A., Etuk uthor, E. T., Baba, D. L., Mohammed, M., & Yakubu, H. A. (2017)
Series/Report no.: Volume 8;Issue 2
Abstract: Variations in approved cost of projects are common and could be triggered by a fluctuation in interest rates and variation project duration. The paper aimed to explain the effect of time overrun (TO) and inflation rate on project completion cost (PCO). Variations in costs and durations of projects were calculated for 250 government and private building projects executed between 2005 and 2015, while inflation rates for the last quarter of these years were used. A multiple regression analysis of cost overrun as the endogenous variable, with time overrun and inflation rates as the exogenous variable was conducted for private and government funded projects. The result revealed that the cost overrun can be predicted by the equations; predicted private cost overrun = -669673.60 + 50182.35 (time overrun) + 106690.20 (inflation rate), and predicted government cost overrun = -9805996 – 148721.90 (time overrun) + 1266038 (inflation rate) respectively for private and government funded projects. Also, while there is an evidence of significant relationship between completion cost of projects and variations in time and inflation rate for both private and government-funded projects, the mean variations between time overrun and inflation rate viz-a-viz completion cost are not equal for private and government funded projects.
Description: International Journal of Sustainable Construction Engineering & Technology
URI: http://penerbit.uthm.edu.my/ojs/index.php/IJSCET
http://repository.futminna.edu.ng:8080/jspui/handle/123456789/8404
ISSN: 2180-3242
Appears in Collections:Project management Technology

Files in This Item:
File Description SizeFormat 
Journal 7.pdf495.42 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.