Please use this identifier to cite or link to this item: http://repository.futminna.edu.ng:8080/jspui/handle/123456789/702
Full metadata record
DC FieldValueLanguage
dc.contributor.authorAbdullahi, Amina Haja-
dc.contributor.authorJimoh, Richard Ajayi-
dc.contributor.authorOyewobi, Luqman Oyekunle-
dc.contributor.authorIsa, Rasheed Babatunde-
dc.date.accessioned2021-06-01T21:06:10Z-
dc.date.available2021-06-01T21:06:10Z-
dc.date.issued2016-
dc.identifier.citationAbdullahi, A. H, Jimoh, R. A, Oyewobi, L. O. and Isa, R. B. (2016). Effects of Construction Communication Barriers on Project Objectives in Abuja-Nigeria. In: Aigbavboa, C. O and Thwala, W. D. (Eds). Proceeding of the 5th International Conference on Infrastructure Development in Africa, (ICIDA), 10-12 July, Johannesburg, South Africa, Pp. 87-96en_US
dc.identifier.urihttp://repository.futminna.edu.ng:8080/jspui/handle/123456789/702-
dc.description.abstractThe construction industry is wholly reliant upon effective communication between individuals, teams and organizations. However, in a project-based industry, interaction tends to be characterized by unfamiliar groups of people coming together for short periods before disbanding to work on other endeavours. Communication within projectbased environments presents special challenges. Hence, this study assessed the effects of construction communication barriers on project objectives in Abuja-Nigeria through the self-administration of 155 questionnaires to construction firms identified. In addition to this, 15 active sites were un-obstructively observed. Results showed that out of 10 variables measured, 5 had high effect on time, while for cost and safety, 1 variable each had high effect on them. Drawings (architectural, services and structural) were the most effective and most often used on the sites observed. Accuracy had very high effect on project objectives in the sense that if inaccurate information was given, it caused project delay (time), caused rework (cost) and also had effect on safety. Information accuracy should always be emphasised on since it has high effect on the project objectives.en_US
dc.publisherProceeding of the 5th International Conference on Infrastructure Development in Africa, (ICIDA)en_US
dc.subjectChannel; Communication; Information; Mode; Nigeria; Project objectivesen_US
dc.titleEffects of Construction Communication Barriers on Project Objectives in Abuja-Nigeriaen_US
dc.typeArticleen_US
Appears in Collections:Quantity Surveying

Files in This Item:
File Description SizeFormat 
ICIDA_Abdullahi et al..pdfConference Proceedings357.33 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.