Please use this identifier to cite or link to this item: http://repository.futminna.edu.ng:8080/jspui/handle/123456789/6873
Full metadata record
DC FieldValueLanguage
dc.contributor.authorOkosun, Blessing Odianosen-
dc.contributor.authorIdiake, John Ebhohimen-
dc.contributor.authorOyewobi, Luqman Oyekunle-
dc.contributor.authorShittu, Abdullateef Adewale-
dc.date.accessioned2021-07-06T19:19:51Z-
dc.date.available2021-07-06T19:19:51Z-
dc.date.issued2019-11-
dc.identifier.citationOkosun, Blessing Odianosen, Idiake, John Ebhohimen, Oyewobi, Luqman Oyekunle & Shittu, Abdullateef Adewale (2019). Determination of Key Factors Affecting Stakeholder Management Process of Construction Projects in Nigeria. Journal of Environmental Studies (Environs).Faculty of Environmental Design, Ahmadu Bello University Zaria, Nigeria. Volume 4(9): 102-117. ISSN: 1119-547X.en_US
dc.identifier.issn1119-547X-
dc.identifier.urihttp://repository.futminna.edu.ng:8080/jspui/handle/123456789/6873-
dc.descriptionNational Journal Paperen_US
dc.description.abstractManaging multiple stakeholders and maintaining an acceptable balance between their interests are crucial to successful project delivery. Several factors impede the management of stakeholders for sustainable construction projects. Previous studies focused on general factors that affect construction projects but a gap exist in the aspects of key factors such as conflict, cost marginalization, management factors and how these factors impact on stakeholder management process which have not been researched in detailed. Hence this study determined key factors that affect stakeholder management process of construction projects in Nigeria. The study assessed 86 factors affecting stakeholder management which was sub grouped into 12 main factors. The study employed the use of self-administered questionnaires on stakeholders within the construction projects. A total of 170 questionnaires were returned giving a 73.5% response rate. Responses obtained from the respondents were collated and then analysed using mean, correlation and regression analysis. The study found out that management, conflict and marginalization factors are significant factors to be considered and improved upon in future construction projects. The study recommended that management support group should be put in place to manage stakeholders.en_US
dc.language.isoenen_US
dc.publisherJournal of Environmental Studies (Environs).Faculty of Environmental Design, Ahmadu Bello University Zaria, Nigeriaen_US
dc.relation.ispartofseriesVolume 4;Number 9-
dc.subjectConstruction, Factors, Projects, Stakeholders, Processen_US
dc.titleDetermination of Key Factors Affecting Stakeholder Management Process of Construction Projects in Nigeriaen_US
dc.typeArticleen_US
Appears in Collections:Quantity Surveying

Files in This Item:
File Description SizeFormat 
Shittu's Publication 68.pdf2.98 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.