Please use this identifier to cite or link to this item: http://repository.futminna.edu.ng:8080/jspui/handle/123456789/6126
Full metadata record
DC FieldValueLanguage
dc.contributor.authorDukiya, J. J.-
dc.contributor.authorAdejumo, T. E.-
dc.date.accessioned2021-07-03T12:08:29Z-
dc.date.available2021-07-03T12:08:29Z-
dc.date.issued2020-
dc.identifier.citationDukiya and Adejumo, 2020en_US
dc.identifier.urihttp://repository.futminna.edu.ng:8080/jspui/handle/123456789/6126-
dc.description.abstractUnlike in the developed countries, road rehabilitation timing has recently become a subject of consideration and attracting much attention in developing countries like Nigeria. Increase in international roughness index (IRI) on Nigerian roads corroborated this fact. This study focuses on trailer/truck loads pattern, highway regulations and standard life span of highways, annual budgetary allocations to road construction and rehabilitations, and the adoption of weigh-in-motion (WIM) device on Nigerian carriageways. The study reveals that the increase in freight movement and growth in E80s/heavy vehicles (HV) traffic on inter-state roads has tripled within the last 5 years. It further revealed that the highway life span has reduced to 2 years in Nigeria, and thereby increased the national recurrent expenditure on road transport. Results from this study shows that the deplorable conditions of the national highways have resulted in the loss of about ₦175 billion to the Nigerian economy. Lastly, this setback of none implementation of weighbridges and WIM devices on Nigeria roads can be attributed to political vested interest, lack of will power and governance offered by the ruling class in the country rather than technicality.en_US
dc.description.sponsorshipSelfen_US
dc.language.isoenen_US
dc.publisherInternational Journal of Transp. Development and Integration, Wessex Institute, Southampton, United Kingdomen_US
dc.relation.ispartofseries;4(1)-
dc.subjectcarriageway, highway, road capacity, trailer/truck, vehicle axle, weigh-in-motion.en_US
dc.titleThe Menace of Uncontrolled Trailer/Truck Loads and the use of Weigh-in-motion Device on Carriage ways in Nigeriaen_US
dc.typeArticleen_US
Appears in Collections:Civil Engineering

Files in This Item:
File Description SizeFormat 
Dukiya and Adejumo_IJOTRADI 4_1 Paper print.pdf855.9 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.