Building : [239] Collection home page

Building

Browse
Subscribe to this collection to receive daily e-mail notification of new additions RSS Feed RSS Feed RSS Feed
Collection's Items (Sorted by Submit Date in Descending order): 201 to 220 of 239
Issue DateTitleAuthor(s)
2008-04Comparative Assessment of Construction plant Procurement Methods in Minna and Jos MetropolisHassan Ibrahim Ogiri; Ogunbode, E. B.
2015Formwork and False Work Hazards in Construction: Status and Effects in Bloemfontein, South AfricaEmuze, Fidelis; Mothokho, L.; Aka, Adefemi
2017Mapping waste in structural design process in South African projects.Aka, Adefemi; Emuze, Fidelis; Das, Dillip
2014A MECHANISM FOR WASTE REDUCTION IN STRUCTURAL DESIGN PROCESS IN SOUTH AFRICAN CONSTRUCTIONAka, Adefemi; Emuze, Fidelis; Das, Dillip
2013COMPARATIVE ANALYSIS OF CONCRETE PRODUCED WITH DIFFERENT POZZOLANSAka, Adefemi; Adamu, Nasir; Muhammed, Hassan Nensok
2013Effect of Admixture on Fire Resistance of Ordinary Portland Cement ConcreteAka, Adefemi; Muhammad, Usman; Muhammad, Umar; Olugbenga, Samuel
2020A NIGERIAN CASED-BASED STUDY OF NON-VALUE ADDING ACTIVITIES AND THEIR REDUCTION IN CONCRETE PAVER PRODUCTIONAka, Adefemi; Emuze, Fidelis
2019A Conceptual Framework for Waste Identification and Reduction in Nigerian Sandcrete Block Production Process.Aka, Adefemi; Bamgbade, Abosede Adebisi; Ibrahim, Saidu; Balogun, Oladimaji Moses
2019-12-01Application of Lean Manufacturing Tools and Techniques for Waste Reduction in Nigerian Bricks Production Process.Aka, Adefemi; Isah, Abubakar; Eze, Chukwudum J.; Owolabi, Timileyin
2013Strength Characteristics of Concrete made with Rice Husk Ash as Partial Replacement of Cement using Periwinkle Shell as Coarse Aggregate.Ayegba, Calistus
2014Stakeholders Perspective of the Impact of Risk Factors on Cost, Time and Quality of Building Construction ProjectsIjigah, Augustine Edoka; Agbo, Edwin, A; Ayegba, Calistus
2013Kiln-Dust as Partial Replacement of Cement in ConcreteAgbo, Edwin, A; Ayegba, Calistus
2019Exploring the Drivers and Barriers for Sustainable Infrastructure Projects Delivery in Sub-Saharan AfricaIsa, R.B; Bilau, A.A; Nmadu, H.G; Ogunbode, E.B; Ayegba, Calistus
2018Duties and Required Competencies of a Management ContractorAyegba, Calistus
2014) Critical Factors Influencing Construction Labour Productivity in Carpentry and Steel Fixing in North Central NigeriaAgbo, Edwin, A; Ayegba, Calistus
2018COLLABORATION AND LONG-TERM RELATIONSHIPS IN CONSTRUCTIONAyegba, Calistus; Kamudyariwa, Xebiso; Root, David
2020Preparation and Characterization of Nanosilica from Sorghum Husk Ash By Chemical MethodAkaleme, M. C.; Hassan Ibrahim Ogiri; Olawuyi, B. J.
2019Effect of Sulphate on Mortar with Sugarcane Bagasse ash and Calcium Carbide Waste.Shettima, A. U.; Hassan Ibrahim Ogiri; Abu, Y.
2014Assessment of Craftsmen Turnover in the Construction IndustryAyegba, Calistus; Agbo, Edwin, A
2014Appraisal of systematic training practices by building construction firms in Nigeria.Ayegba, Calistus; Dzasu, W
Collection's Items (Sorted by Submit Date in Descending order): 201 to 220 of 239