Please use this identifier to cite or link to this item: http://repository.futminna.edu.ng:8080/jspui/handle/123456789/3977
Full metadata record
DC FieldValueLanguage
dc.contributor.authorALAO, T. O-
dc.date.accessioned2021-06-20T04:02:52Z-
dc.date.available2021-06-20T04:02:52Z-
dc.date.issued2018-04-
dc.identifier.issn0189 - 8787-
dc.identifier.urihttp://repository.futminna.edu.ng:8080/jspui/handle/123456789/3977-
dc.description.abstractA numerical method to estimate the cost of component proportions for laterite-cement brick production is developed using an all-in rate estimation of cost. The procedure employed a method related approach to minimize material, labour and plant cost which will enable achieving meeting specified requirement of cost. Three (3) mixture design approaches were employed for building up the material composition which enabled it possible to develop prediction equations for the cost: namely, the Scheffe’s mixture theory, the Central Composite Design (CCD) method and a Traditional Trial Mix method. In using these approaches, a three component formulation of mixture using water, cement and laterite to produce laterite-cement bricks was carried out with cement content ranging within the domains of 8-20% by weight of laterite. The procedure is adaptable for a 10MN/m2 compactive effort using the Hydraform Twin-M7 machine.en_US
dc.language.isoenen_US
dc.publisherJournal of Research Information in Civil Engineering, University of Ilorinen_US
dc.relation.ispartofseries;Vol. 15. No. 1 Pages 1940-2082-
dc.subjectBricks, method related, estimate, trial mix, laterite, Scheffe’s mixtureen_US
dc.titleA rational approach to estimating the cost of laterite-cement bricksen_US
dc.typeArticleen_US
Appears in Collections:Building

Files in This Item:
File Description SizeFormat 
USEP-RICE-Rational Approach.pdf885.34 kBAdobe PDFView/Open
USEP_RICE_Rational Approach Cover.pdf285.24 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.