Please use this identifier to cite or link to this item: http://repository.futminna.edu.ng:8080/jspui/handle/123456789/3316
Title: Analysis of Factors Responsible for Efficiency Losses in Construction Projects in Nigeria.
Authors: LOYA, Osusha Samuel
Anifowose, Opeyemi Maroof
Keywords: efficiency losses
productivity
factor analysis
construction project
Nigeria
Issue Date: 2021
Publisher: Hummingbird Publications and Research International on Integrated strategies for African Development. University of Ibadan, UNIBADAN, Oyo State, Nigeria.
Citation: LOYA, O. S and ANIFOWOSE, O. M (2021) Analysis of Factors Responsible for Efficiency Losses in Construction Projects in Nigeria. The Proceeding of 16th Interdisciplinary Academic Conference, Hummingbird Publications and Research International on Integrated strategies for African Development: Sustainable Development. Vol. 22 No. 2, 25th March, 2021 at University of Ibadan, UNIBADAN, Oyo State, Nigeria.
Abstract: The construction industry is the economic prime mover of nations and it influences and propels infrastructural provision and development. Labour Efficiency losses on construction works have denied the reaping of the full benefits of the industry; as it has led to cost and time overruns, poor quality, claims and disputes. This study adopts exploratory factor analysis to analyse the factors responsible for efficiency losses in construction projects in Abuja, Nigeria. The data gathered through the self-administration of questionnaires using simple random sampling techniques, were analysed using Percentages, frequencies and factor analysis (FA). The study found that the major cluster of factors responsible for efficiency losses are; construction method and poor documents, Communication and materials related causes, Poor supervision and planning, Equipment installation related causes, and industrial action and weather related causes. It was concluded that both private and public construction projects suffer s from efficiency losses. Accurate timing and scheduling of projects activities, efficient communications, use of experienced supervisory staff and staff training and retraining on modern construction methods were advocated to eliminate labour loss efficiencies.
URI: http://repository.futminna.edu.ng:8080/jspui/handle/123456789/3316
ISBN: 889-217-978-542-6
Appears in Collections:Quantity Surveying

Files in This Item:
File Description SizeFormat 
Analysis of Factors Responsible for Efficiency Losses in Construction Projects in Nigeria.pdfConference Proceeding4.24 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.