Please use this identifier to cite or link to this item: http://repository.futminna.edu.ng:8080/jspui/handle/123456789/2879
Full metadata record
DC FieldValueLanguage
dc.contributor.authorAka, Adefemi-
dc.contributor.authorEmuze, Fidelis-
dc.contributor.authorDas, Dillip-
dc.date.accessioned2021-06-13T12:44:23Z-
dc.date.available2021-06-13T12:44:23Z-
dc.date.issued2017-
dc.identifier.citationAka A., Emuze F. and Das D., (2017). Mapping waste in structural design process in South African projects. In: LC3 2017 Volume II - Proceedings of the 25th Annual Conference of the International Group for Lean Construction (IGLC), Walsh, K., Sacks, R., Brilakis, I. (eds.), Heraklion, Crete, Greece pp. 475-482.en_US
dc.identifier.urihttp://repository.futminna.edu.ng:8080/jspui/handle/123456789/2879-
dc.descriptionConference Paperen_US
dc.description.abstractNon-Value Adding Activities That Are Otherwise Called ‘Waste’ In The Lean Terms Have Continue To Hinder Efficient Project Delivery In The Construction Industry. As Such, The Types Of Waste And Their Impact Are Subject Of Many Studies. However, Much Have Not Been Done Regarding Waste In The Structural Design Process (Sdp). This Paper Reports On An On-Going Action Research Study On Waste In The Sdp. To Understand The Waste Types And Their Effects, The Lean Tool, Value Stream Mapping (Vsm), Has Been Deployed In The Doctoral Study. To Make Use Of The Tool For Sdp, A Purposively Selected Sample Of Consulting Structural Engineers, Practicing In Bloemfontein Were Interviewed In 2015. After That, A Vsm Depicting The Current State Of The Sdp And The Waste In The Process Was Compiled. The Vsm Tool Was Used To Analyze And Design The Flow Of Information. Major Waste Types Include Waiting Time, Excessive Motion, Excessive Production, And Excessive Inspection. The Eradication Of These Waste Influenced The Design Of A Proposed Future State Vsm Wherein All The Identified Problems Are Adequately Addressed. The Applicability And Usefulness Of The Vsm As It Enables Structural Designers To Perceive The Various Activities That Could Be Trimmed In Each Phase Of The Sdp Is Supported By The Results Of The Study, Although The Credibility Of The Future State Vsm Is Currently Being Examined By The Consulting Engineers. URL: https://apo.org.au/node/304690en_US
dc.description.sponsorshipCUT, Free State Doctoral Students Granten_US
dc.language.isoenen_US
dc.publisherInternational Group for Lean Construction (IGLC)en_US
dc.subjectConstructionen_US
dc.subjectDesignen_US
dc.subjectValue sream mappingen_US
dc.subjectWasteen_US
dc.titleMapping waste in structural design process in South African projects.en_US
dc.typePresentationen_US
Appears in Collections:Building

Files in This Item:
File Description SizeFormat 
7-IGLC.pdf921.44 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.