Please use this identifier to cite or link to this item: http://repository.futminna.edu.ng:8080/jspui/handle/123456789/27397
Title: Adoption of building information modelling for post-construction in Nigeria: examination of barriers and strategies development
Authors: Bello, Abdulkabir O
Ayegba, Calistus
Keywords: Barriers
Building information modelling
Developing countries
Post-construction
Strategies
Technology application
Issue Date: 1-Feb-2024
Publisher: Emerald Publishing Limited
Citation: Bello, A. O., and Ayegba, C. (2024)
Abstract: Purpose – Despite successfully adopting building information modelling (BIM) for design and construction, its adoption in post-construction is critically lagging. This study aims to investigate the adoption of BIM for post-construction in Nigeria. Specifically, it aims to investigate the barriers hindering BIM adoption, propose strategies to facilitate its integration into the post-construction phase and examine the relationship between the barriers and strategies towards adopting BIM for post-construction. Design/methodology/approach – This study employs a quantitative approach to gather numerical data on BIM perceived barriers among International Facility Management Association (IFMA) members. The study also develops strategies from an extensive literature review and combines them with insights from preliminary investigation. The data were analysed using descriptive and inferential statistics. Findings – The top perceived barriers among the professionals are lack of BIM awareness, software availability issues and difficulties using new technologies. Institute training/workshops on BIM software for the professionals in the organisation, including BIM software courses in various related professional exams, and encouraging adoption of BIM from the grassroots, such as higher institutions, emerge as the top strategies. The findings further show a significant relationship between the barriers and strategies, emphasising the recognition that understanding barriers prompts the active development and implementation of strategies. Originality/value – This study holds originality in its examination of the relationship between the barriers and strategies associated with BIM adoption in Nigerian Architecture, Construction, Engineering and Operation.
URI: http://repository.futminna.edu.ng:8080/jspui/handle/123456789/27397
ISSN: 2398-4708
Appears in Collections:Building

Files in This Item:
File Description SizeFormat 
Adoption of building information modelling for post-construction in Nigeria.pdf541.6 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.