Please use this identifier to cite or link to this item:
http://repository.futminna.edu.ng:8080/jspui/handle/123456789/23836
Title: | FACTOR INFLUENCING CONSTRUCTION TIME AND COST OVERRUN FOR HIGH RISE BUILDING PROJECT IN ABUJA METROPOLIS |
Authors: | AREO, DANIEL |
Issue Date: | Apr-2023 |
URI: | http://repository.futminna.edu.ng:8080/jspui/handle/123456789/23836 |
Appears in Collections: | Industrial and Technology Education |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
FACTOR INFLUENCING CONSTRUCTION TIME AND COST OVERRUN FOR HIGH RISE BUILDING PROJECT IN ABUJA METROPOLIS.pdf | 1.24 MB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.