Title: Influence of Hazard Recognition Measures on Safety Performance of Building Workers in Abuja, Nigeria
Authors: Doko, Abdullateef
Shittu, Abullateef
Oke, Abdulganiu
Keywords: Building, Costs, Maintenance, Risk, Risk register
Issue Date: Jan-2019
Publisher: International Journal of Strategic Research in Education, Technology & Humanities (IJSRETH). Lextra Education Ltd., UK.
Citation: Aisha U. Doko, Abdullateef A. Shittu & Abdulganiyu A. Oke (2019). Influence of Hazard Recognition Measures on Safety Performance of Building Workers in Abuja, Nigeria. In A. D. El-Ladan (Ed.). International Journal of Strategic Research in Education, Technology & Humanities (IJSRETH). Lextra Education Ltd., UK. January, 2019. 6(1): 107 - 115. ISSN Print: 2465-731X; ISSN Online: 2467-818X.
Series/Report no.: Volume 6;Number 1
Abstract: The construction industry has a track record of poor cost performance which has been attributed to the effects of risk. Yet, early firm estimate of what the project will cost. The action of risk on project cost has been studied risk register methodology in some previous studies, but new and maintenance projects were not examined separately. The paper established the distribution of risks associated with costs of new building and building maintenance projects by focusing on the risk consequences that could be determined from the final accounts of projects only. Project Quantity Surveyors (PQS) were presented with checklists of 19 risk factors collated from the literature, and were asked to associate risk factors with changes to project costs of 69 projects that were found to be suitable for the purposes of this study. Using a 4-order polynomial trend line, it was found that the number of risk events encountered in new buildings peaked at 25% and 68% completion, as opposed to 15% and 45% in the case of maintenance projects. The study concluded that project consultants were responsible for the highest numbers of risk events (70%), and that the majority of additional project costs (81.8%) were associated with very few risks events that had large cost impacts (8.2% of all risk events). It was recommended that clients and architects need to finalize project briefs early in the project lifecycle such that changes to the brief during construction will be minimal.
Description: International Journal
URI: http://repository.futminna.edu.ng:8080/jspui/handle/123456789/2151
ISSN: 2467-818X.
Appears in Collections:Quantity Surveying